fb_off.png twitter_off.png
SUBSCRIBE TO OUR NEWSLETTER

Search

Final Inspection


After the final inspections you can be assured of the actual energy performance of your house. The Final Inspection includes the following components:

FINAL PERFORMANCE TESTING OF HOME COMPONENTS

Performance testing of a home after completion ensures that installations are meeting expectations. Testing includes:

  • Blower door test to ensure the building envelope meets minimum air leakage requirements or goals
  • Verification of insulation compliance and performance
  • Pressure testing ducts to verify efficient delivery of heating and cooling
  • Testing of ventilation fan flow for indoor air quality as required by ASHRAE 62.2

 

COMPLETION OF THERMAL ENCLOSURE CHECKLIST

Final details of the ENERGY STAR Thermal Enclosure Checklist started during the pre-drywall inspection are completed.

 

CONFIRMED REMRate MODELING

Comprehensive REMRate energy modeling integrates all details of the final inspection results to verify completed home meets minimum performance requirements under IECC and other performance goals. This modeling verifies the performance levels against the initial Projected Energy modeling. A final HERs score and performance summary of the home is generated.

 

PAPERWORK SUBMITTAL TO INCENTIVE AND CERTIFICATION PROGRAMS

Lightly Treading will complete and submit paperwork for eligible homes to predetermined certification or incentive programs as confirmed with builder at time of contract and performance goals meeting.

Learn more about various certification programs by clicking here.